OTHER SERVICES
ARK Power Solutions Private Limited

"An ISO: 9001- 2015 Company"

QC TEST / FACTORY TEST

QC TEST / FACTORY TEST

1. CONTROL PANEL
  • Control Scheme Check
  • Relay & Meter Test
  • 2.TRANSFORMER
  • Routine Test
  • Transformer Special Test
    1. Capacitance & Tan Delta Measurement
    2. Sweep Frequency Response Analysis
    3. Oil Insulation Diagnostics Test
    3. RELAYS
  • All protections shall be checked by secondary injection method
  • * Testing will be done using conventional test kits & special kits will be used where ever required

    SOIL RESISTIVITY TEST

    SOIL RESISTIVITY TEST

    Measure Resistance Value & Average Resistive of soils by
  • Four Pole Method

  • Digital Earth
    Tester

    Multi Functional
    Primary Injection
    Test Kit

    * Testing will be done using conventional test kits & special kits will be used where ever required

    OIL FILTRATION

    OIL FILTRATION

  • Vehicle Mounted Integrated Filtration & Test Equiment
  • Filtration of Transformer Oil
  • BDV Test (withstand 60 KV/min as per IS)
  • Acidity Test
  • Tranfromer Oil Analysis: Oil Sample will be collected given to NABL Accredited Lab
  • Capacity 4500 Liters per hour

  • ONLOAD TAP CHANGER (OLTC) SERVICING

    ONLOAD TAP CHANGER (OLTC) SERVICING

  • Opening of OLTC Top Cover.
  • Draining of oil.
  • Cleaning of carbon particles inside the OLTC.
  • Hot oil bath for OLTC.
  • Top covers gasket changing.
  • Alignment of Mechanism.
  • Testing
  • HT/LT SWITCHGEAR PANEL CLEANING

    HT/LT BREAKER SERVICING

  • Breaker will be drawn out.
  • Cleaning of Housing.
  • Cleaning of Mechanism & Arch Chamber.
  • Tightening using Torque wrench
  • Lubrication of Movement Mechanism.
  • Testing for Close & Open (Electrically & Mechanically)
  • HT/LT SWITCHGEAR PANEL CLEANING

    HT/LT SWITCHGEAR PANEL CLEANING

  • Cleaning of panels
  • Ensure tightening of Electrical connection.
  • Lubrication of Movement Mechanism.
  • Testing
  • NEW EARTH-PIT LAYING

    NEW EARTH-PIT LAYING

    Conventional Earth Pit
  • Charcoal & Salt (Number of layers)
  • GI pipe or Copper pipe will be used for earth pit construction.
  • Concrete chamber with steel plate will be constructed.
  • PAINTING

    PAINTING

    TRANSFORMER / CONTROL PANEL / DIESEL GENERATOR / JUNCTION BOX ETC
  • Cleanig of Oil & dust will be done by using thinner & cotton waste.
  • Rough & Smooth emery paper will be used to remove oil stains & patches on outer surface of transformer, Control Panels, DG, JB & Radiators.
  • Emery applied surface will be cleaned with Paint & Polish Remover using cotton waste.
  • Painting will be done by using Spray Painting Gun / Brush / Rollers.
  • No. of Painting Coats as per job requirements or Client requirement.
  • ENERGY AUDIT

    ENERGY AUDIT

  • Simulation
  • Measurement
  • Assessment
  • Recommendation
  • Implementation
  • Multi Functional
    Primary Injection
    Test Kit

    Power Quality &
    Energy Analyzers
    (Online Testing)

    RELAY SETTING & CO-ORDINATION

    RELAY SETTING & CO-ORDINATION

  • Data Collection from site
  • Relay Setting Calculations
  • Upload relay setting
  • Testing

  • Secondary Injection
    3 Phase Relay
    Test Kit

    QC TEST / FACTORY TEST

    CONSULTANCY

  • Mitigation of dispute on Electricity Taxes & Tarff pertaining to CPP/IPP with Concerned Authorities.
  • Obtaining Government clearance for CPP/IPP projects from Various Departments in Conventional / Renewable Sector.