UTILITY
OPERATION & MAINTENANCE
ARK Power Solutions Private Limited

"An ISO: 9001- 2015 Company"

 Power Transformer

POWER TRANSFORMER

DAILY CHECKS & MAINTENANCE
  • HT & LT Voltage and Current reading
  • WTI & OTI Reading
  • Oil level in conservator tank & OLTC tank
  • Tap position & Tap changer counter reading
  • PRV status & Buchholz relay status
  • Condition of silica gel in breathers
  • Cleanliness of transformer and accessories
  • Visual leakage / seepage of oil
  • Humming/any abnormal sound of transformer and accessories.
QUARTERLY CHECKS & MAINTENANCE
  • Checking of OLTC mechanism Step by step
  • Tightening of HV & LV connection
  • Checking of gas collection in Buchholz relay & cleaning of glass cover
  • Operation of tap changer from local and remote
  • Condition check/replacement of silica gel
  • Alarm/Tripping signal checking of OTI, WTI, Buchholz and PRV signal at panel.
  • Testing of oil (BDV and Moisture content)
YEARLY CHECKS & MAINTENANCE
  • Cleaning of Transformer
  • Oil leakages checks for all joint & attend the leaks
  • Inspection of CT JB and tightness the TB
  • Inspection of transformer and replace the faulty components
  • Testing of oil (DGA & IS-1866 characteristics)
  • Painting of transformer (if peel off condition)
  • Routine and special test on transformer

Oil Insulation
Diagnostic
Test Kit

Capacitance & Tan
Delta Measurements
Test Kit

Multi Functional
Primary Injection
Test Kit

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

 AUXILIARY TRANSFORMER

AUXILIARY TRANSFORMER

DAILY CHECKS & MAINTENANCE
  • HT & LT Voltage and Current reading
  • WTI & OTI Reading
  • Oil level in conservator tank & OLTC tank
  • Tap position & Tap changer counter reading
  • PRV status & Buchholz relay status
  • Condition of silica gel in breathers
  • Cleanliness of transformer and accessories
  • Visual leakage / seepage of oil
  • Humming/any abnormal sound of transformer and accessories
QUARTERLY CHECKS & MAINTENANCE
  • Checking of OLTC mechanism Step by step
  • Tightening of HV & LV connection
  • Checking of gas collection in Buchholz relay & cleaning of glass cover
  • Operation of tap changer from local and remote
  • Condition check/replacement of silica gel
  • Alarm/Tripping signal checking of OTI, WTI, Buchholz and PRV signal at panel
  • Testing of oil (BDV and Moisture content)
YEARLY CHECKS & MAINTENANCE
  • Cleaning of Transformer
  • Oil leakages checks for all joint & attend the leaks
  • Inspection of CT JB and tightness the TB
  • Inspection of transformer and replace the faulty components
  • Testing of oil (DGA & IS-1866 characteristics)
  • Painting of transformer (if peel off condition)
  • Routine and special test on transformer

Digital IR
Tester

Transformer
Test Board

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

 CURRENT TRANSFORMER

CURRENT TRANSFORMER

DAILY CHECKS & MAINTENANCE
  • Oil level in tank
  • Leakage / seepage of oil
  • Humming/any abnormal sound of transformer.
QUARTERLY CHECKS & MAINTENANCE
  • Oil level in tank
  • Leakage / seepage of oil (if oil mechanism)
  • Leakage of SF6 gas (if pressure drops)
  • Checks the healthiness of local panel components
  • Checks hotspot and conductor snapping in HV connections
YEARLY CHECKS & MAINTENANCE
  • Cleaning & clamps connector tightness
  • Oil leakages checks for all joint & attend the leaks
  • Inspection local panel and tightness the TB
  • Replace the faulty components
  • Checks the local and remote operation
  • Calibrate the relay
  • Routine test on transformer

CT Analyzer
Test Kit

Capacitance & Tan
Delta Measurements
Test Kit

Multi Functional
Primary Injection
Test Kit

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

 POTENTIAL TRANSFORMER

POTENTIAL   TRANSFORMER

DAILY CHECKS & MAINTENANCE
  • Oil level in tank
  • Leakage / seepage of oil
  • Humming/any abnormal sound of transformer.
QUARTERLY CHECKS & MAINTENANCE
  • Oil level in tank
  • Leakage / seepage of oil (if oil mechanism)
  • Leakage of SF6 gas (if pressure drops)
  • Checks the healthiness of local panel components
  • Checks hotspot and conductor snapping in HV connections
YEARLY CHECKS & MAINTENANCE
  • Cleaning & clamps connector tightness
  • Oil leakages checks for all joint & attend the leaks
  • Inspection local panel and tightness the TB
  • Replace the faulty components
  • Checks the local and remote operation
  • Calibrate the relay
  • Routine test on transformer

CT Analyzer
Test Kit

Capacitance & Tan
Delta Measurements
Test Kit

Multi Functional
Primary Injection
Test Kit

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

 CIRCUIT BREAKER

CIRCUIT   BREAKER

DAILY CHECKS & MAINTENANCE
  • Oil level in tank (if oil mechanism)
  • SF6 gas pressure reading
  • Oil pressure reading (if oil mechanism)
  • Leakage / seepage of oil
  • Healthiness of contactors
  • Compressor run hour meter reading (if pneumatic mechanism)
QUARTERLY CHECKS & MAINTENANCE
  • Oil level in tank
  • Leakage / seepage of oil (if oil mechanism)
  • Leakage of SF6 gas (if pressure drops)
  • Checks the healthiness of local panel components
  • Checks hotspot and conductor snapping in HV connections
  • Checks cracks and damage in insulators
YEARLY CHECKS & MAINTENANCE
  • Cleaning & clamps connector tightness
  • Oil leakages checks for all joint & attend the leaks
  • Inspection local panel and tightness the TB
  • Replace the faulty components
  • Checks the local and remote operation
  • Calibrate the relay
  • Routine test

Digital IR
Tester

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

 ISOLATOR

ISOLATOR

DAILY CHECKS & MAINTENANCE
  • Checks the proper close/open contacts
QUARTERLY CHECKS & MAINTENANCE
  • Checks the proper operation (close/open)
  • Checks the healthiness of MOM box components
  • Checks the healthiness operating motor
  • Check the limit switch setting
  • Checks hotspot and conductor snapping in HV connections
  • Checks cracks and damage in insulators
YEARLY CHECKS & MAINTENANCE
  • Cleaning & clamps connector tightness
  • Inspection local panel and tightness the TB
  • Replace the faulty components
  • Checks the local and remote operation
  • Motor Overload Relay Calibration
  • Routine test

Digital IR
Tester

Contact Resistance
Measurement
Test Kit

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

LIGHTING   ARRESTER

LIGHTING   ARRESTER

DAILY CHECKS & MAINTENANCE
  • Checks counter reading
  • Checks counter in green zone
QUARTERLY CHECKS & MAINTENANCE
  • Checks the healthiness of grounding connection
  • Checks counter reading
  • Checks counter in green zone
  • Checks hotspot and conductor snapping in HV connections
  • Checks cracks and damage in insulators
  • Measurement of leakage current
YEARLY CHECKS & MAINTENANCE
  • Cleaning & clamps connector tightness
  • Routine test

Digital IR
Tester

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

POWER CABLE

POWER CABLE

QUARTERLY CHECKS & MAINTENANCE
  • Checks healthiness of cable
YEARLY CHECKS & MAINTENANCE
  • Ensure tightness at cable termination
  • Routine and special test on cables

Digital IR
Tester

High Voltage
Tester

Capacitance & Tan
Delta Measurements
Test Kit

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

 PROTECTION RELAYS

PROTECTION RELAYS ( NUMERICAL & ELECTRO MAGNETIC )

DAILY CHECKS & MAINTENANCE
  • Cleaning relay panel & avoid the entry from dust & moisture
  • Checks abnormalities and sound
  • Checks the healthiness of indication
YEARLY CHECKS & MAINTENANCE
  • Clean the relay and contacts
  • Ensure the terminal tightness
  • Replace the faulty components
  • Checks the healthiness of contacts
  • Routine test

Secondary Injection
3 Phase Relay
Test Kit

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

“AUXILIARY

AUXILIARY RELAYS

DAILY CHECKS & MAINTENANCE
  • Cleaning relay panel & avoid the entry from dust & moisture
  • Checks abnormalities and sound
  • Checks meter reading for accuracy
  • Checks the Calibration date
YEARLY CHECKS & MAINTENANCE
  • Clean the relay and contacts
  • Ensure the terminal tightness
  • Replace the faulty components
  • Routine test

Secondary Injection
3 Phase Relay
Tester

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

 METERS (OFFLINE & ONLINE)

METER (OFFLINE & ONLINE)

DAILY CHECKS & MAINTENANCE
  • Cleaning meter panel & avoid the entry from dust & moisture
  • Checks abnormalities and sound
  • Check meter reading for accuracy
  • Checks the calibration date
YEARLY CHECKS & MAINTENANCE
  • Clean the relay and contacts
  • Ensure the terminal tightness
  • Replace the faulty components
  • Routine test

Secondary Injection
3 Phase Relay
Test Kit
(Offline Testing)

Power Quality &
Energy Analyzers
(Online Testing)

Panthom Load
Kit
(0.1 Accuracy)

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance

EARTH PIT / EARTH MAT

EARTH PIT / EARTH MAT

QUARTERLY CHECKS & MAINTENANCE
  • Checks the healthiness of pit and contacts
  • Clean the contact & replace the nut bolt if rust found
  • Ensure the terminal tightness
  • Replace the faulty components
  • Add the charcoal, salt if required
  • Measure resistance

Digital Earth
Tester

Multi Functional
Primary Injection
Test Kit

* Testing will be done using conventional test kits & special kits will be used where ever required
* Routine Test Please refer respective slides in Preventive Maintenance